Frequently Asked Questions About Remodeling in Los Angeles
These frequently asked questions about remodeling in Los Angeles cover estimates, permits, timelines, materials, condo requirements and working with a general contractor.
Featured Questions
01ServicesWhat services does Aluna Construction offer?We specialize in high-end kitchen remodels, luxurious bathroom renovations...
We specialize in high-end kitchen remodels, luxurious bathroom renovations, full home transformations, and room additions throughout Los Angeles. From initial concept to final walkthrough, we manage every detail to deliver beautiful, functional living spaces.
02CredentialsAre you licensed and insured?Yes, we are a fully licensed and insured general contractor in California...
Yes, we are a fully licensed and insured general contractor in California (CSLB #1139975), ensuring your property and project are completely protected. We maintain active liability and workers' compensation insurance.
03EstimatesDo you offer free estimates?Yes, we provide complimentary initial consultations and detailed project estimates...
We offer complimentary consultations followed by a site visit to provide accurate, transparent project estimates.
04TimelinesHow long does a typical project take?Timelines vary depending on scope. A bathroom may take 3-4 weeks...
A single room typically requires a few weeks, whereas full home renovations take several months. We always provide a clear timeline during planning.
05Living ArrangementsCan I live in my home during renovation?For specific rooms like a single bathroom or kitchen, yes...
You can often remain in the home during a kitchen or bathroom remodel, though full structural renovations may require temporary relocation.
06Our DifferenceWhat makes Aluna different?We prioritize transparent pricing, clear communication, and impeccable craftsmanship...
Our owner-operated model provides direct accountability, highly structured project management, and a firm commitment to craftsmanship.
Estimates & Costs
How do remodeling estimates work?
When you request an estimate, we schedule an initial consultation to understand your vision and budget. Following a site visit to assess your property's specific conditions, we provide a detailed, itemized proposal. This ensures that you have a clear understanding of the projected costs before any work begins.
Do you offer free estimates?
Yes, we provide complimentary initial consultations and detailed project estimates after our initial site visit.
What information is needed to prepare an estimate?
We typically need a clear understanding of your goals, the specific areas to be remodeled, any design preferences or inspirations you have, and access to the property for a site evaluation.
Why can remodeling estimates vary between contractors?
Estimates vary based on the thoroughness of the scope, the quality of materials specified, the experience of the tradespeople, and whether the contractor includes all necessary prep work, permits, and finishing details or leaves them as allowances.
What may cause the project cost to change?
Hidden conditions (like water damage or outdated electrical discovered behind walls), client-requested changes, material selections, and approved additional work may affect cost.
How are requested scope changes documented?
We use a formal change order process. We present you with a clear outline of any additional costs or timeline adjustments, and no changes are executed without your explicit approval.
Are materials included in the proposal?
Our proposals clearly specify which materials are included (often rough building materials) and which are handled as allowances (like tile, fixtures, and appliances) so you know exactly what you are paying for.
What should I compare when reviewing contractor estimates?
Look beyond the bottom line. Compare the detailed scope of work, the quality of materials, the inclusion of permits and protections, the payment schedule, and the contractor's communication and reputation.
Planning & Timelines
What are the typical project-planning stages?
Planning involves several key phases: scoping, design, material selection, and permitting. We collaborate with you to define the project's parameters, finalize the layout, and choose the right finishes. Thorough planning minimizes delays and unexpected expenses during the construction phase.
Learn about Aluna Construction's remodeling processHow long does a typical remodeling project take?
A bathroom may take 3-4 weeks, a kitchen 6-8 weeks, and full remodels several months. Timing depends on scope, permits, inspections, material availability, building restrictions, and site conditions.
What factors affect the construction timeline?
Timelines can be affected by the speed of municipal permit approvals, the lead times for custom materials (like cabinets or specific tiles), unforeseen structural issues, and any changes made to the design after construction begins.
When should materials be selected?
Ideally, all major materials, fixtures, and finishes should be selected and ordered before demolition begins to prevent delays during construction.
How are trade schedules coordinated?
We manage a tight schedule, sequencing trades (like plumbing, electrical, and drywall) logically so that one phase seamlessly transitions into the next, minimizing downtime on your site.
What happens before construction begins?
Before construction begins, we finalize the contract, pull necessary permits, order long-lead materials, establish site protection protocols, and coordinate a project kickoff meeting with you.
Can work begin before all materials arrive?
Yes, demolition and rough construction (framing, rough plumbing, rough electrical) can often proceed while finish materials are in transit, provided those materials won't hold up critical path items.
How are delays communicated?
If an unexpected delay occurs, your project manager will notify you immediately, explain the cause, outline the solution, and provide an updated timeline.
Permits & Inspections
Do you handle city permits and inspections?
Aluna Construction coordinates applicable permits, inspections, documentation, and building requirements based on the project scope.
Which remodeling projects may require permits?
Permits are typically required for structural changes, moving or adding plumbing, upgrading electrical panels or circuits, modifying HVAC systems, and significant exterior changes. Cosmetic updates like painting or replacing flooring generally do not.
Who schedules inspections?
Our team handles the scheduling and coordination of all required municipal inspections to ensure the work is reviewed and approved at the proper stages.
What happens if an inspector requests a correction?
If an inspector notes a required correction, we address it promptly with our tradespeople and schedule a re-inspection. Our goal is to ensure all work meets or exceeds code requirements.
Are plumbing and electrical permits separate?
Depending on the municipality, plumbing, electrical, and mechanical work often require their own specific permits and inspections, which we coordinate as part of the overall project.
When may engineering or plans be required?
Structural engineering and formal architectural plans are typically required when moving load-bearing walls, adding square footage, or making significant alterations to the roofline or foundation.
How do building requirements affect the schedule?
Strict building codes and the speed of municipal reviews can extend the planning phase. Navigating these requirements properly upfront prevents costly delays during construction.
Condos & HOAs
Can you work in condominiums or managed buildings?
Yes. We have extensive experience working within the strict guidelines of HOAs and condominium boards, managing logistics like elevator reservations and noise restrictions.
View the Century City condo renovationWho reviews the HOA construction package?
We review the HOA construction package alongside you to understand the building's specific rules, working hours, and insurance requirements before submitting for approval.
How are elevator reservations coordinated?
We work directly with building management to schedule padded elevator time for demolition debris removal and major material deliveries to avoid disrupting other residents.
What insurance documents may a building require?
Buildings typically require a Certificate of Insurance (COI) naming the HOA and property management as additional insured, which we provide promptly.
How are common areas protected?
We meticulously protect hallways, lobbies, and elevators with Masonite, Ram Board, and corner guards to ensure no damage occurs to shared spaces.
What are flooring sound requirements?
Many HOAs require specific Sound Transmission Class (STC) and Impact Insulation Class (IIC) ratings for underlayment when installing hard flooring. We ensure all materials meet these strict acoustic standards.
How are plumbing shutoffs coordinated?
We coordinate building-wide or tier-specific water shutoffs with building management and provide proper notice to neighbors when modifying plumbing systems.
Do condo work-hour restrictions affect the timeline?
Yes. Because condos often limit noisy work to specific weekday hours and prohibit weekend work, projects in managed buildings generally take slightly longer than single-family homes.
Materials & Design
How do I choose materials for my remodel?
Aluna can help clients coordinate construction-related selections and review how materials affect installation, sequencing, durability, and project scope.
When should cabinets, tile, flooring, and fixtures be selected?
These selections should be finalized as early as possible—ideally before construction starts—to prevent delays caused by backorders or long manufacturing times.
Can Aluna help review material options?
Yes, we help you evaluate materials for their longevity, maintenance requirements, and suitability for your specific application, ensuring they align with your overall goals.
Who purchases owner-selected fixtures?
While we supply the rough construction materials, clients often purchase their own finish fixtures (like faucets and lighting) directly, or we can facilitate the purchase through our preferred vendors.
What happens when a selected material has a long lead time?
If a material has a long lead time, we will either advise you to select an alternative or structure the project schedule to accommodate the wait without halting overall progress.
Can materials be changed after construction begins?
Changes can be made, but they may incur restocking fees, require a change order, and potentially delay the project if the new materials are not immediately available.
How do material changes affect cost and scheduling?
Switching to a different material can affect the labor required for installation and the overall timeline. Any such changes are documented and approved before proceeding.
Construction & Communication
Can I live in my home during renovation?
For specific rooms like a single bathroom or kitchen, yes. For full home remodels, we often recommend temporarily relocating. We always coordinate with you to minimize disruption and protect your living areas.
How will the work area be protected?
We use zip walls, floor protection, and localized air filtration to contain dust and debris to the immediate construction zone, keeping the rest of your home as clean as possible.
Who manages the subcontractors and trades?
We handle all management and scheduling of trusted, specialized subcontractors. You only need to communicate with us.
How does Aluna communicate during construction?
Clear communication is the foundation of our process. You will have a dedicated point of contact who will provide regular updates on the project's progress, upcoming milestones, and any required decisions. Winston Vlessing leads client communication, growth, and project strategy.
What happens if the scope changes?
Sometimes, unforeseen issues arise, or you may decide to add features after the project has started. In these cases, we use a formal change order process.
How are site questions and decisions handled?
We hold regular site meetings and communicate via email or phone to address questions, review progress, and finalize critical layout decisions as the space takes shape.
Will the property be cleaned during construction?
Yes, our team performs daily "broom-clean" sweeps to maintain a safe and organized job site, minimizing the impact on your property.
Who is responsible for day-to-day field management?
Daniel Vlessing leads construction operations, field coordination, and quality control, ensuring every detail is executed correctly on-site.
How are electrical, plumbing, and HVAC trades coordinated?
We sequence these critical trades seamlessly, ensuring rough-ins are completed and inspected before walls are closed, preventing delays and rework.
Completion & Follow-Up
What happens during the final walkthrough?
Before we consider a project complete, we conduct a meticulous final walkthrough with you. We review every detail of the newly remodeled space to ensure it meets our rigorous quality standards and your expectations.
How are remaining items documented?
During the walkthrough, we document any minor touch-ups or adjustments needed on a formal punch list, which our team addresses promptly before final handover.
When is a project considered complete?
A project is complete when all items on the punch list are resolved, final inspections are passed, and you are fully satisfied with the results.
Are systems and fixtures tested?
Yes, we rigorously test all new plumbing, electrical, HVAC, and appliances to ensure everything is fully functional and safe to use.
What closeout documents may be provided?
Depending on the scope, we provide applicable manuals, warranties for installed equipment, and final inspection records.
How is final payment handled?
Final payment is invoiced only after the punch list is complete and you have signed off on the finished project.
Who should I contact after completion if I have a question?
You can continue to reach out to your dedicated project manager or our main office. We stand behind our work and are always available to answer post-construction questions.
Questions Homeowners Ask Before Hiring a Contractor
Questions About Specific Remodeling Services




Every property and renovation scope is different. Tell us what you are planning, where the property is located, and which questions you need answered.
Contact Aluna Construction to discuss your property, project scope, building requirements, and the next steps for your renovation.